Chapter 36.70B RCW

LOCAL PROJECT REVIEW

Sections

HTMLPDF 36.70B.010Findings and declaration.
HTMLPDF 36.70B.020Definitions.
HTMLPDF 36.70B.030Project reviewRequired elementsLimitations.
HTMLPDF 36.70B.040Determination of consistency.
HTMLPDF 36.70B.050Local government review of project permit applications requiredObjectives.
HTMLPDF 36.70B.060Local governments planning under the growth management act to establish integrated and consolidated project permit processRequired elements.
HTMLPDF 36.70B.070Project permit applicationsDetermination of completenessNotice to applicant.
HTMLPDF 36.70B.080Development regulationsRequirementsReport on implementation costs.
HTMLPDF 36.70B.100Designation of person or entity to receive determinations and notices.
HTMLPDF 36.70B.110Notice of applicationRequired elementsIntegration with other review proceduresAdministrative appeals.
HTMLPDF 36.70B.120Permit review process.
HTMLPDF 36.70B.130Notice of decisionDistribution.
HTMLPDF 36.70B.140Project permits that may be excluded from review.
HTMLPDF 36.70B.150Local governments not planning under the growth management act may use provisions.
HTMLPDF 36.70B.160Additional project review encouragedConstruction (as amended by 2023 c 333).
HTMLPDF 36.70B.160Additional project review encouragedAdditional measures for certain jurisdictionsConstruction (as amended by 2023 c 338).
HTMLPDF 36.70B.170Development agreementsAuthorized.
HTMLPDF 36.70B.180Development agreementsEffect.
HTMLPDF 36.70B.190Development agreementsRecordingParties and successors bound.
HTMLPDF 36.70B.200Development agreementsPublic hearing.
HTMLPDF 36.70B.210Development agreementsAuthority to impose fees not extended.
HTMLPDF 36.70B.220Permit assistance staff.
HTMLPDF 36.70B.230Planning regulationsCopies provided to county assessor.
HTMLPDF 36.70B.240Consolidated permit review grant program.
HTMLPDF 36.70B.241Permit review process update grant program.
HTMLPDF 36.70B.245Technical assistance to local governments.
HTMLPDF 36.70B.250Data reporting template.
HTMLPDF 36.70B.260Electricity projectsProhibition on demonstration of need.
HTMLPDF 36.70B.270Construction crane safetyLocal government permitting.
HTMLPDF 36.70B.900FindingSeverabilityPart headings and table of contents not law1995 c 347.


Findings and declaration.

The legislature finds and declares the following:
(1) As the number of environmental laws and development regulations has increased for land uses and development, so has the number of required local land use permits, each with its own separate approval process.
(2) The increasing number of local and state land use permits and separate environmental review processes required by agencies has generated continuing potential for conflict, overlap, and duplication between the various permit and review processes.
(3) This regulatory burden has significantly added to the cost and time needed to obtain local and state land use permits and has made it difficult for the public to know how and when to provide timely comments on land use proposals that require multiple permits and have separate environmental review processes.



Definitions.

Unless the context clearly requires otherwise, the definitions in this section apply throughout this chapter.
(1) "Closed record appeal" means an administrative appeal on the record to a local government body or officer, including the legislative body, following an open record hearing on a project permit application when the appeal is on the record with no or limited new evidence or information allowed to be submitted and only appeal argument allowed.
(2) "Local government" means a county, city, or town.
(3) "Open record hearing" means a hearing, conducted by a single hearing body or officer authorized by the local government to conduct such hearings, that creates the local government's record through testimony and submission of evidence and information, under procedures prescribed by the local government by ordinance or resolution. An open record hearing may be held prior to a local government's decision on a project permit to be known as an "open record predecision hearing." An open record hearing may be held on an appeal, to be known as an "open record appeal hearing," if no open record predecision hearing has been held on the project permit.
(4) "Project permit" or "project permit application" means any land use or environmental permit or license required from a local government for a project action, including but not limited to subdivisions, binding site plans, planned unit developments, conditional uses, shoreline substantial development permits, site plan review, permits or approvals required by critical area ordinances, site-specific rezones which do not require a comprehensive plan amendment, but excluding the adoption or amendment of a comprehensive plan, subarea plan, or development regulations except as otherwise specifically included in this subsection.
(5) "Public meeting" means an informal meeting, hearing, workshop, or other public gathering of people to obtain comments from the public or other agencies on a proposed project permit prior to the local government's decision. A public meeting may include, but is not limited to, a design review or architectural control board meeting, a special review district or community council meeting, or a scoping meeting on a draft environmental impact statement. A public meeting does not include an open record hearing. The proceedings at a public meeting may be recorded and a report or recommendation may be included in the local government's project permit application file.



Project reviewRequired elementsLimitations.

(1) Fundamental land use planning choices made in adopted comprehensive plans and development regulations shall serve as the foundation for project review. The review of a proposed project's consistency with applicable development regulations, or in the absence of applicable regulations the adopted comprehensive plan, under RCW 36.70B.040 shall incorporate the determinations under this section.
(2) During project review, a local government or any subsequent reviewing body shall determine whether the items listed in this subsection are defined in the development regulations applicable to the proposed project or, in the absence of applicable regulations the adopted comprehensive plan. At a minimum, such applicable regulations or plans shall be determinative of the:
(a) Type of land use permitted at the site, including uses that may be allowed under certain circumstances, such as planned unit developments and conditional and special uses, if the criteria for their approval have been satisfied;
(b) Density of residential development in urban growth areas; and
(c) Availability and adequacy of public facilities identified in the comprehensive plan, if the plan or development regulations provide for funding of these facilities as required by chapter 36.70A RCW.
(3) During project review, the local government or any subsequent reviewing body shall not reexamine alternatives to or hear appeals on the items identified in subsection (2) of this section, except for issues of code interpretation. As part of its project review process, a local government shall provide a procedure for obtaining a code interpretation as provided in RCW 36.70B.110.
(4) Pursuant to RCW 43.21C.240, a local government may determine that the requirements for environmental analysis and mitigation measures in development regulations and other applicable laws provide adequate mitigation for some or all of the project's specific adverse environmental impacts to which the requirements apply.
(5) Nothing in this section limits the authority of a permitting agency to approve, condition, or deny a project as provided in its development regulations adopted under chapter 36.70A RCW and in its policies adopted under RCW 43.21C.060. Project review shall be used to identify specific project design and conditions relating to the character of development, such as the details of site plans, curb cuts, drainage swales, transportation demand management, the payment of impact fees, or other measures to mitigate a proposal's probable adverse environmental impacts, if applicable.
(6) Subsections (1) through (4) of this section apply only to local governments planning under RCW 36.70A.040.

NOTES:

IntentFindings1995 c 347 ss 404 and 405: "In enacting RCW 36.70B.030 and 36.70B.040, the legislature intends to establish a mechanism for implementing the provisions of chapter 36.70A RCW regarding compliance, conformity, and consistency of proposed projects with adopted comprehensive plans and development regulations. In order to achieve this purpose the legislature finds that:
(1) Given the extensive investment that public agencies and a broad spectrum of the public are making and will continue to make in comprehensive plans and development regulations for their communities, it is essential that project review start from the fundamental land use planning choices made in these plans and regulations. If the applicable regulations or plans identify the type of land use, specify residential density in urban growth areas, and identify and provide for funding of public facilities needed to serve the proposed development and site, these decisions at a minimum provide the foundation for further project review unless there is a question of code interpretation. The project review process, including the environmental review process under chapter 43.21C RCW and the consideration of consistency, should start from this point and should not reanalyze these land use planning decisions in making a permit decision.
(2) Comprehensive plans and development regulations adopted by local governments under chapter 36.70A RCW and environmental laws and rules adopted by the state and federal government have addressed a wide range of environmental subjects and impacts. These provisions typically require environmental studies and contain specific standards to address various impacts associated with a proposed development, such as building size and location, drainage, transportation requirements, and protection of critical areas. When a permitting agency applies these existing requirements to a proposed project, some or all of a project's potential environmental impacts will be avoided or otherwise mitigated. Through the integrated project review process described in subsection (1) of this section, the local government will determine whether existing requirements, including the applicable regulations or plans, adequately analyze and address a project's environmental impacts. RCW 43.21C.240 provides that project review should not require additional studies or mitigation under chapter 43.21C RCW where existing regulations have adequately addressed a proposed project's probable specific adverse environmental impacts.
(3) Given the hundreds of jurisdictions and agencies in the state and the numerous communities and applicants affected by development regulations and comprehensive plans adopted under chapter 36.70A RCW, it is essential to establish a uniform framework for considering the consistency of a proposed project with the applicable regulations or plan. Consistency should be determined in the project review process by considering four factors found in applicable regulations or plans: The type of land use allowed; the level of development allowed, such as units per acre or other measures of density; infrastructure, such as the adequacy of public facilities and services to serve the proposed project; and the character of the proposed development, such as compliance with specific development standards. This uniform approach corresponds to existing project review practices and will not place a burden on applicants or local government. The legislature intends that this approach should be largely a matter of checking compliance with existing requirements for most projects, which are simple or routine, while more complex projects may require more analysis. RCW 43.21C.240 and 36.70B.030 establish this uniform framework and also direct state agencies to consult with local government and the public to develop a better format than the current environmental checklist to meet this objective.
(4) When an applicant applies for a project permit, consistency between the proposed project and applicable regulations or plan should be determined through a project review process that integrates land use and environmental impact analysis, so that governmental and public review of the proposed project as required by this chapter, by development regulations under chapter 36.70A RCW, and by the environmental process under chapter 43.21C RCW run concurrently and not separately.
(5) RCW 36.70B.030 and 36.70B.040 address three related needs with respect to how the project review process should address consistency between a proposed project and the applicable regulations or plan:
(a) A uniform framework for the meaning of consistency;
(b) An emphasis on relying on existing requirements and adopted standards, with the use of supplemental authority as specified by chapter 43.21C RCW to the extent that existing requirements do not adequately address a project's specific probable adverse environmental impacts; and
(c) The identification of three basic land use planning choices made in applicable regulations or plans that, at a minimum, serve as a foundation for project review and that should not be reanalyzed during project permitting." [ 1995 c 347 s 403.]



Determination of consistency.

(1) A proposed project's consistency with a local government's development regulations adopted under chapter 36.70A RCW, or, in the absence of applicable development regulations, the appropriate elements of the comprehensive plan adopted under chapter 36.70A RCW shall be decided by the local government during project review by consideration of:
(a) The type of land use;
(b) The level of development, such as units per acre or other measures of density;
(c) Infrastructure, including public facilities and services needed to serve the development; and
(d) The characteristics of the development, such as development standards.
(2) In deciding whether a project is consistent, the determinations made pursuant to RCW 36.70B.030(2) shall be controlling.
(3) For purposes of this section, the term "consistency" shall include all terms used in this chapter and chapter 36.70A RCW to refer to performance in accordance with this chapter and chapter 36.70A RCW, including but not limited to compliance, conformity, and consistency.
(4) Nothing in this section requires documentation, dictates an agency's procedures for considering consistency, or limits a city or county from asking more specific or related questions with respect to any of the four main categories listed in subsection (1)(a) through (d) of this section.
(5) The department of commerce is authorized to develop and adopt by rule criteria to assist local governments planning under RCW 36.70A.040 to analyze the consistency of project actions. These criteria shall be jointly developed with the department of ecology.

NOTES:

Explanatory statement2023 c 470: See note following RCW 10.99.030.
Severability1997 c 429: See note following RCW 36.70A.3201.
IntentFindings1995 c 347 ss 404 and 405: See note following RCW 36.70B.030.



Local government review of project permit applications requiredObjectives.

Not later than March 31, 1996, each local government shall provide by ordinance or resolution for review of project permit applications to achieve the following objectives:
(1) Combine the environmental review process, both procedural and substantive, with the procedure for review of project permits; and
(2) Except for the appeal of a determination of significance as provided in RCW 43.21C.075, provide for no more than one open record hearing and one closed record appeal.



Local governments planning under the growth management act to establish integrated and consolidated project permit processRequired elements.

Not later than March 31, 1996, each local government planning under RCW 36.70A.040 shall establish by ordinance or resolution an integrated and consolidated project permit process that may be included in its development regulations. In addition to the elements required by RCW 36.70B.050, the process shall include the following elements:
(1) A determination of completeness to the applicant as required by RCW 36.70B.070;
(2) A notice of application to the public and agencies with jurisdiction as required by RCW 36.70B.110;
(3) Except as provided in RCW 36.70B.140, an optional consolidated project permit review process as provided in RCW 36.70B.120. The review process shall provide for no more than one consolidated open record hearing and one closed record appeal. If an open record predecision hearing is provided prior to the decision on a project permit, the process shall not allow a subsequent open record appeal hearing;
(4) Provision allowing for any public meeting or required open record hearing to be combined with any public meeting or open record hearing that may be held on the project by another local, state, regional, federal, or other agency, in accordance with provisions of RCW * 36.70B.090 and 36.70B.110;
(5) A single report stating all the decisions made as of the date of the report on all project permits included in the consolidated permit process that do not require an open record predecision hearing and any recommendations on project permits that do not require an open record predecision hearing. The report shall state any mitigation required or proposed under the development regulations or the agency's authority under RCW 43.21C.060. The report may be the local permit. If a threshold determination other than a determination of significance has not been issued previously by the local government, the report shall include or append this determination;
(6) Except for the appeal of a determination of significance as provided in RCW 43.21C.075, if a local government elects to provide an appeal of its threshold determinations or project permit decisions, the local government shall provide for no more than one consolidated open record hearing on such appeal. The local government need not provide for any further appeal and may provide an appeal for some but not all project permit decisions. If an appeal is provided after the open record hearing, it shall be a closed record appeal before a single decision-making body or officer;
(7) A notice of decision as required by RCW 36.70B.130 and issued within the time period provided in RCW 36.70B.080 and * 36.70B.090;
(8) Completion of project review by the local government, including environmental review and public review and any appeals to the local government, within any applicable time periods under *RCW 36.70B.090; and
(9) Any other provisions not inconsistent with the requirements of this chapter or chapter 43.21C RCW.

NOTES:

*Reviser's note: RCW 36.70B.090 expired June 30, 2000, pursuant to 1998 c 286 s 8.



Project permit applicationsDetermination of completenessNotice to applicant.

(1)(a) Within 28 days after receiving a project permit application, a local government planning pursuant to RCW 36.70A.040 shall provide a written determination to the applicant.
(b) The written determination must state either:
(i) That the application is complete; or
(ii) That the application is incomplete and that the procedural submission requirements of the local government have not been met. The determination shall outline what is necessary to make the application procedurally complete.
(c) The number of days shall be calculated by counting every calendar day.
(d) To the extent known by the local government, the local government shall identify other agencies of local, state, or federal governments that may have jurisdiction over some aspect of the application.
(2) A project permit application is complete for purposes of this section when it meets the procedural submission requirements of the local government, as outlined on the project permit application. Additional information or studies may be required or project modifications may be undertaken subsequent to the procedural review of the application by the local government. The determination of completeness shall not preclude the local government from requesting additional information or studies either at the time of the notice of completeness or subsequently if new information is required or substantial changes in the proposed action occur. However, if the procedural submission requirements, as outlined on the project permit application have been provided, the need for additional information or studies may not preclude a completeness determination.
(3) The determination of completeness may include or be combined with the following:
(a) A preliminary determination of those development regulations that will be used for project mitigation;
(b) A preliminary determination of consistency, as provided under RCW 36.70B.040;
(c) Other information the local government chooses to include; or
(d) The notice of application pursuant to the requirements in RCW 36.70B.110.
(4)(a) An application shall be deemed procedurally complete on the 29th day after receiving a project permit application under this section if the local government does not provide a written determination to the applicant that the application is procedurally incomplete as provided in subsection (1)(b)(ii) of this section. When the local government does not provide a written determination, they may still seek additional information or studies as provided for in subsection (2) of this section.
(b) Within 14 days after an applicant has submitted to a local government additional information identified by the local government as being necessary for a complete application, the local government shall notify the applicant whether the application is complete or what additional information is necessary.
(c) The notice of application shall be provided within 14 days after the determination of completeness pursuant to RCW 36.70B.110.

NOTES:

Severability1994 c 257: See note following RCW 36.70A.270.



Development regulationsRequirementsReport on implementation costs. (Effective until January 1, 2025.)

(1) Development regulations adopted pursuant to RCW 36.70A.040 must establish and implement time periods for local government actions for each type of project permit application and provide timely and predictable procedures to determine whether a completed project permit application meets the requirements of those development regulations. The time periods for local government actions for each type of complete project permit application or project type should not exceed one hundred twenty days, unless the local government makes written findings that a specified amount of additional time is needed to process specific complete project permit applications or project types.
The development regulations must, for each type of permit application, specify the contents of a completed project permit application necessary for the complete compliance with the time periods and procedures.
(2)(a) Counties subject to the requirements of RCW 36.70A.215 and the cities within those counties that have populations of at least twenty thousand must, for each type of permit application, identify the total number of project permit applications for which decisions are issued according to the provisions of this chapter. For each type of project permit application identified, these counties and cities must establish and implement a deadline for issuing a notice of final decision as required by subsection (1) of this section and minimum requirements for applications to be deemed complete under RCW 36.70B.070 as required by subsection (1) of this section.
(b) Counties and cities subject to the requirements of this subsection also must prepare annual performance reports that include, at a minimum, the following information for each type of project permit application identified in accordance with the requirements of (a) of this subsection:
(i) Total number of complete applications received during the year;
(ii) Number of complete applications received during the year for which a notice of final decision was issued before the deadline established under this subsection;
(iii) Number of applications received during the year for which a notice of final decision was issued after the deadline established under this subsection;
(iv) Number of applications received during the year for which an extension of time was mutually agreed upon by the applicant and the county or city;
(v) Variance of actual performance, excluding applications for which mutually agreed time extensions have occurred, to the deadline established under this subsection during the year; and
(vi) The mean processing time and the number standard deviation from the mean.
(c) Counties and cities subject to the requirements of this subsection must:
(i) Provide notice of and access to the annual performance reports through the county's or city's website; and
(ii) Post electronic facsimiles of the annual performance reports through the county's or city's website. Postings on a county's or city's website indicating that the reports are available by contacting the appropriate county or city department or official do not comply with the requirements of this subsection.
If a county or city subject to the requirements of this subsection does not maintain a website, notice of the reports must be given by reasonable methods, including but not limited to those methods specified in RCW 36.70B.110(4).
(3) Nothing in this section prohibits a county or city from extending a deadline for issuing a decision for a specific project permit application for any reasonable period of time mutually agreed upon by the applicant and the local government.
(4) The *department of community, trade, and economic development shall work with the counties and cities to review the potential implementation costs of the requirements of subsection (2) of this section. The department, in cooperation with the local governments, shall prepare a report summarizing the projected costs, together with recommendations for state funding assistance for implementation costs, and provide the report to the governor and appropriate committees of the senate and house of representatives by January 1, 2005.
[ 2004 c 191 s 2; 2001 c 322 s 1; 1995 c 347 s 410; (1995 c 347 s 409 expired July 1, 2000); 1994 c 257 s 3. Formerly RCW 36.70A.065.]

NOTES:

*Reviser's note: The "department of community, trade, and economic development" was renamed the "department of commerce" by 2009 c 565.
FindingsIntent2004 c 191: "The legislature finds that the timely issuance of project permit decisions by local governments serves the public interest. When these decisions, that are often responses to land use and building permit applications, are issued according to specific and locally established time periods and without unnecessary or inappropriate delays, the public enjoys greater efficiency, consistency, and predictability in the permitting process.
The legislature also finds that full access to relevant performance data produced annually by local governments for each type of permit application affords elected officials, project proponents, and the general public the opportunity to review and compare the permit application and processing performance of jurisdictions. Furthermore, the legislature finds that the review and comparison of this data, and the requirement to provide convenient and direct internet access to germane and consistent reports, will likely foster improved methods for processing applications, and issuing project permit decisions in a timely manner.
The legislature, therefore, intends to continue and clarify the requirements for certain jurisdictions to produce and provide access to annual permitting performance reports." [ 2004 c 191 s 1.]
Effective date1995 c 347 s 410: "Section 410, chapter 347, Laws of 1995 shall take effect July 1, 2000." [ 1998 c 286 s 10; 1995 c 347 s 412.]
Expiration date1995 c 347 s 409: "The amendments to RCW 36.70B.080 contained in section 409, chapter 347, Laws of 1995 shall expire July 1, 2000." [ 1998 c 286 s 9; 1995 c 347 s 411.]
Severability1994 c 257: See note following RCW 36.70A.270.
Development regulations must provide sufficient land capacity for development: RCW 36.70A.115.

Development regulationsRequirementsReport on implementation costs. (Effective January 1, 2025.)

(1)(a) Development regulations adopted pursuant to RCW 36.70A.040 must establish and implement time periods for local government actions for each type of project permit application and provide timely and predictable procedures to determine whether a completed project permit application meets the requirements of those development regulations. The time periods for local government actions for each type of complete project permit application or project type should not exceed those specified in this section.
(b) For project permits submitted after January 1, 2025, the development regulations must, for each type of permit application, specify the contents of a completed project permit application necessary for the complete compliance with the time periods and procedures.
(c) A jurisdiction may exclude certain permit types and timelines for processing project permit applications as provided for in RCW 36.70B.140.
(d) The time periods for local government action to issue a final decision for each type of complete project permit application or project type subject to this chapter should not exceed the following time periods unless modified by the local government pursuant to this section or RCW 36.70B.140:
(i) For project permits which do not require public notice under RCW 36.70B.110, a local government must issue a final decision within 65 days of the determination of completeness under RCW 36.70B.070;
(ii) For project permits which require public notice under RCW 36.70B.110, a local government must issue a final decision within 100 days of the determination of completeness under RCW 36.70B.070; and
(iii) For project permits which require public notice under RCW 36.70B.110 and a public hearing, a local government must issue a final decision within 170 days of the determination of completeness under RCW 36.70B.070.
(e) A jurisdiction may modify the provisions in (d) of this subsection to add permit types not identified, change the permit names or types in each category, address how consolidated review time periods may be different than permits submitted individually, and provide for how projects of a certain size or type may be differentiated, including by differentiating between residential and nonresidential permits. Unless otherwise provided for the consolidated review of more than one permit, the time period for a final decision shall be the longest of the permit time periods identified in (d) of this subsection or as amended by a local government.
(f) If a local government does not adopt an ordinance or resolution modifying the provisions in (d) of this subsection, the time periods in (d) of this subsection apply.
(g) The number of days an application is in review with the county or city shall be calculated from the day completeness is determined under RCW 36.70B.070 to the date a final decision is issued on the project permit application. The number of days shall be calculated by counting every calendar day and excluding the following time periods:
(i) Any period between the day that the county or city has notified the applicant, in writing, that additional information is required to further process the application and the day when responsive information is resubmitted by the applicant;
(ii) Any period after an applicant informs the local government, in writing, that they would like to temporarily suspend review of the project permit application until the time that the applicant notifies the local government, in writing, that they would like to resume the application. A local government may set conditions for the temporary suspension of a permit application; and
(iii) Any period after an administrative appeal is filed until the administrative appeal is resolved and any additional time period provided by the administrative appeal has expired.
(h) The time periods for a local government to process a permit shall start over if an applicant proposes a change in use that adds or removes commercial or residential elements from the original application that would make the application fail to meet the determination of procedural completeness for the new use, as required by the local government under RCW 36.70B.070.
(i) If, at any time, an applicant informs the local government, in writing, that the applicant would like to temporarily suspend the review of the project for more than 60 days, or if an applicant is not responsive for more than 60 consecutive days after the county or city has notified the applicant, in writing, that additional information is required to further process the application, an additional 30 days may be added to the time periods for local government action to issue a final decision for each type of project permit that is subject to this chapter. Any written notice from the local government to the applicant that additional information is required to further process the application must include a notice that nonresponsiveness for 60 consecutive days may result in 30 days being added to the time for review. For the purposes of this subsection, "nonresponsiveness" means that an applicant is not making demonstrable progress on providing additional requested information to the local government, or that there is no ongoing communication from the applicant to the local government on the applicant's ability or willingness to provide the additional information.
(j) Annual amendments to the comprehensive plan are not subject to the requirements of this section.
(k) A county's or city's adoption of a resolution or ordinance to implement this subsection shall not be subject to appeal under chapter 36.70A RCW unless the resolution or ordinance modifies the time periods provided in (d) of this subsection by providing for a review period of more than 170 days for any project permit.
(l)(i) When permit time periods provided for in (d) of this subsection, as may be amended by a local government, and as may be extended as provided for in (i) of this subsection, are not met, a portion of the permit fee must be refunded to the applicant as provided in this subsection. A local government may provide for the collection of only 80 percent of a permit fee initially, and for the collection of the remaining balance if the permitting time periods are met. The portion of the fee refunded for missing time periods shall be:
(A) 10 percent if the final decision of the project permit application was made after the applicable deadline but the period from the passage of the deadline to the time of issuance of the final decision did not exceed 20 percent of the original time period; or
(B) 20 percent if the period from the passage of the deadline to the time of the issuance of the final decision exceeded 20 percent of the original time period.
(ii) Except as provided in RCW 36.70B.160, the provisions in subsection (l)(i) of this section are not applicable to cities and counties which have implemented at least three of the options in RCW 36.70B.160(1) (a) through (j) at the time an application is deemed procedurally complete.
(2)(a) Counties subject to the requirements of RCW 36.70A.215 and the cities within those counties that have populations of at least 20,000 must, for each type of permit application, identify the total number of project permit applications for which decisions are issued according to the provisions of this chapter. For each type of project permit application identified, these counties and cities must establish and implement a deadline for issuing a notice of final decision as required by subsection (1) of this section and minimum requirements for applications to be deemed complete under RCW 36.70B.070 as required by subsection (1) of this section.
(b) Counties and cities subject to the requirements of this subsection also must prepare an annual performance report that includes information outlining time periods for certain permit types associated with housing. The report must provide:
(i) Permit time periods for certain permit processes in the county or city in relation to those established under this section, including whether the county or city has established shorter time periods than those provided in this section;
(ii) The total number of decisions issued during the year for the following permit types: Preliminary subdivisions, final subdivisions, binding site plans, permit processes associated with the approval of multifamily housing, and construction plan review for each of these permit types when submitted separately;
(iii) The total number of decisions for each permit type which included consolidated project permit review, such as concurrent review of a rezone or construction plans;
(iv) The average number of days from a submittal to a decision being issued for the project permit types listed in *subsection (2)(a)(ii) of this section. This shall be calculated from the day completeness is determined under RCW 36.70B.070 to the date a decision is issued on the application. The number of days shall be calculated by counting every calendar day;
(v) The total number of days each project permit application of a type listed in *subsection (2)(a)(ii) of this section was in review with the county or city. This shall be calculated from the day completeness is determined under RCW 36.70B.070 to the date a final decision is issued on the application. The number of days shall be calculated by counting every calendar day. The days the application is in review with the county or city does not include the time periods in subsection (1)(g)(i)-(iii) [(1)(g)(i) through (iii)] of this section;
(vi) The total number of days that were excluded from the time period calculation under subsection (1)(g)(i)-(iii) [(1)(g)(i) through (iii)] of this section for each project permit application of a type listed in *subsection (2)(a)(ii) of this section.
(c) Counties and cities subject to the requirements of this subsection must:
(i) Post the annual performance report through the county's or city's website; and
(ii) Submit the annual performance report to the department of commerce by March 1st each year.
(d) No later than July 1st each year, the department of commerce shall publish a report which includes the annual performance report data for each county and city subject to the requirements of this subsection and a list of those counties and cities whose time periods are shorter than those provided for in this section.
The annual report must also include key metrics and findings from the information collected.
(e) The initial annual report required under this subsection must be submitted to the department of commerce by March 1, 2025, and must include information from permitting in 2024.
(3) Nothing in this section prohibits a county or city from extending a deadline for issuing a decision for a specific project permit application for any reasonable period of time mutually agreed upon by the applicant and the local government.
[ 2023 c 338 s 7; 2004 c 191 s 2; 2001 c 322 s 1; 1995 c 347 s 410; (1995 c 347 s 409 expired July 1, 2000); 1994 c 257 s 3. Formerly RCW 36.70A.065.]

NOTES:

*Reviser's note: The reference to RCW 36.70B.080(2)(a)(ii) appears to be erroneous. RCW 36.70B.080(2)(b)(ii) was apparently intended.
Effective date2023 c 338 s 7: "Section 7 of this act takes effect January 1, 2025." [ 2023 c 338 s 13.]
FindingsIntent2004 c 191: "The legislature finds that the timely issuance of project permit decisions by local governments serves the public interest. When these decisions, that are often responses to land use and building permit applications, are issued according to specific and locally established time periods and without unnecessary or inappropriate delays, the public enjoys greater efficiency, consistency, and predictability in the permitting process.
The legislature also finds that full access to relevant performance data produced annually by local governments for each type of permit application affords elected officials, project proponents, and the general public the opportunity to review and compare the permit application and processing performance of jurisdictions. Furthermore, the legislature finds that the review and comparison of this data, and the requirement to provide convenient and direct internet access to germane and consistent reports, will likely foster improved methods for processing applications, and issuing project permit decisions in a timely manner.
The legislature, therefore, intends to continue and clarify the requirements for certain jurisdictions to produce and provide access to annual permitting performance reports." [ 2004 c 191 s 1.]
Effective date1995 c 347 s 410: "Section 410, chapter 347, Laws of 1995 shall take effect July 1, 2000." [ 1998 c 286 s 10; 1995 c 347 s 412.]
Expiration date1995 c 347 s 409: "The amendments to RCW 36.70B.080 contained in section 409, chapter 347, Laws of 1995 shall expire July 1, 2000." [ 1998 c 286 s 9; 1995 c 347 s 411.]
Severability1994 c 257: See note following RCW 36.70A.270.
Development regulations must provide sufficient land capacity for development: RCW 36.70A.115.



Designation of person or entity to receive determinations and notices.

A local government may require the applicant for a project permit to designate a single person or entity to receive determinations and notices required by this chapter.



Notice of applicationRequired elementsIntegration with other review proceduresAdministrative appeals.

(1) Not later than April 1, 1996, a local government planning under RCW 36.70A.040 shall provide a notice of application to the public and the departments and agencies with jurisdiction as provided in this section. If a local government has made a threshold determination under chapter 43.21C RCW concurrently with the notice of application, the notice of application may be combined with the threshold determination and the scoping notice for a determination of significance. Nothing in this section prevents a determination of significance and scoping notice from being issued prior to the notice of application. Nothing in this section or this chapter prevents a lead agency, when it is a project proponent or is funding a project, from conducting its review under chapter 43.21C RCW or from allowing appeals of procedural determinations prior to submitting a project permit.
(2) The notice of application shall be provided within 14 days after the determination of completeness as provided in RCW 36.70B.070 and, except as limited by the provisions of subsection (4)(b) of this section, must include the following in whatever sequence or format the local government deems appropriate:
(a) The date of application, the date of the notice of completion for the application, and the date of the notice of application;
(b) A description of the proposed project action and a list of the project permits included in the application and, if applicable, a list of any studies requested under RCW 36.70B.070;
(c) The identification of other permits not included in the application to the extent known by the local government;
(d) The identification of existing environmental documents that evaluate the proposed project, and, if not otherwise stated on the document providing the notice of application, such as a city land use bulletin, the location where the application and any studies can be reviewed;
(e) A statement of the public comment period, which shall be not less than fourteen nor more than thirty days following the date of notice of application, and statements of the right of any person to comment on the application, receive notice of and participate in any hearings, request a copy of the decision once made, and any appeal rights. A local government may accept public comments at any time prior to the closing of the record of an open record predecision hearing, if any, or, if no open record predecision hearing is provided, prior to the decision on the project permit;
(f) The date, time, place, and type of hearing, if applicable and scheduled at the date of notice of the application;
(g) A statement of the preliminary determination, if one has been made at the time of notice, of those development regulations that will be used for project mitigation and of consistency as provided in RCW 36.70B.030(2) and 36.70B.040; and
(h) Any other information determined appropriate by the local government.
(3) If an open record predecision hearing is required for the requested project permits, the notice of application shall be provided at least fifteen days prior to the open record hearing.
(4) A local government shall use reasonable methods to give the notice of application to the public and agencies with jurisdiction and may use its existing notice procedures. A local government may use different types of notice for different categories of project permits or types of project actions. If a local government by resolution or ordinance does not specify its method of public notice, the local government shall use the methods provided for in (a) and (b) of this subsection. Examples of reasonable methods to inform the public are:
(a) Posting the property for site-specific proposals;
(b) Publishing notice, including at least the project location, description, type of permit(s) required, comment period dates, and location where the notice of application required by subsection (2) of this section and the complete application may be reviewed, in the newspaper of general circulation in the general area where the proposal is located or in a local land use newsletter published by the local government;
(c) Notifying public or private groups with known interest in a certain proposal or in the type of proposal being considered;
(d) Notifying the news media;
(e) Placing notices in appropriate regional or neighborhood newspapers or trade journals;
(f) Publishing notice in agency newsletters or sending notice to agency mailing lists, either general lists or lists for specific proposals or subject areas; and
(g) Mailing to neighboring property owners.
(5) A notice of application shall not be required for project permits that are categorically exempt under chapter 43.21C RCW, unless an open record predecision hearing is required or an open record appeal hearing is allowed on the project permit decision.
(6) A local government shall integrate the permit procedures in this section with environmental review under chapter 43.21C RCW as follows:
(a) Except for a threshold determination and except as otherwise expressly allowed in this section, the local government may not issue a decision or a recommendation on a project permit until the expiration of the public comment period on the notice of application.
(b) If an open record predecision hearing is required, the local government shall issue its threshold determination at least fifteen days prior to the open record predecision hearing.
(c) Comments shall be as specific as possible.
(d) A local government is not required to provide for administrative appeals of its threshold determination. If provided, an administrative appeal must be filed within fourteen days after notice that the determination has been made and is appealable. Except as otherwise expressly provided in this section, the appeal hearing on a threshold determination must be consolidated with any open record hearing on the project permit.
(7) At the request of the applicant, a local government may combine any hearing on a project permit with any hearing that may be held by another local, state, regional, federal, or other agency, if:
(a) The hearing is held within the geographic boundary of the local government; and
(b) The applicant agrees to the schedule in the event that additional time is needed in order to combine the hearings. All agencies of the state of Washington, including municipal corporations and counties participating in a combined hearing, are hereby authorized to issue joint hearing notices and develop a joint format, select a mutually acceptable hearing body or officer, and take such other actions as may be necessary to hold joint hearings consistent with each of their respective statutory obligations.
(8) All state and local agencies shall cooperate to the fullest extent possible with the local government in holding a joint hearing if requested to do so, as long as:
(a) The agency is not expressly prohibited by statute from doing so;
(b) Sufficient notice of the hearing is given to meet each of the agencies' adopted notice requirements as set forth in statute, ordinance, or rule; and
(c) The agency has received the necessary information about the proposed project from the applicant to hold its hearing at the same time as the local government hearing.
(9) A local government is not required to provide for administrative appeals. If provided, an administrative appeal of the project decision and of any environmental determination issued at the same time as the project decision, shall be filed within fourteen days after the notice of the decision or after other notice that the decision has been made and is appealable. The local government shall extend the appeal period for an additional seven days, if state or local rules adopted pursuant to chapter 43.21C RCW allow public comment on a determination of nonsignificance issued as part of the appealable project permit decision.
(10) The applicant for a project permit is deemed to be a participant in any comment period, open record hearing, or closed record appeal.
(11) Each local government planning under RCW 36.70A.040 shall adopt procedures for administrative interpretation of its development regulations.

NOTES:

Severability1997 c 429: See note following RCW 36.70A.3201.



Permit review process.

(1) Each local government planning under RCW 36.70A.040 shall establish a permit review process that provides for the integrated and consolidated review and decision on two or more project permits relating to a proposed project action, including a single application review and approval process covering all project permits requested by an applicant for all or part of a project action and a designated permit coordinator. If an applicant elects the consolidated permit review process, the determination of completeness, notice of application, and notice of final decision must include all project permits being reviewed through the consolidated permit review process.
(2) Consolidated permit review may provide different procedures for different categories of project permits, but if a project action requires project permits from more than one category, the local government shall provide for consolidated permit review with a single open record hearing and no more than one closed record appeal as provided in RCW 36.70B.060. Each local government shall determine which project permits are subject to an open record hearing and a closed record appeal. Examples of categories of project permits include but are not limited to:
(a) Proposals that are categorically exempt from chapter 43.21C RCW, such as construction permits, that do not require environmental review or public notice;
(b) Permits that require environmental review, but no open record predecision hearing; and
(c) Permits that require a threshold determination and an open record predecision hearing and may provide for a closed record appeal to a hearing body or officer or to the local government legislative body.
(3) A local government may provide by ordinance or resolution for the same or a different decision maker or hearing body or officer for different categories of project permits. In the case of consolidated project permit review, the local government shall specify which decision makers shall make the decision or recommendation, conduct the hearing, or decide the appeal to ensure that consolidated permit review occurs as provided in this section. The consolidated permit review may combine an open record predecision hearing on one or more permits with an open record appeal hearing on other permits. In such cases, the local government by ordinance or resolution shall specify which project permits, if any, shall be subject to a closed record appeal.



Notice of decisionDistribution.

A local government planning under RCW 36.70A.040 shall provide a notice of decision that also includes a statement of any threshold determination made under chapter 43.21C RCW and the procedures for administrative appeal, if any. The notice of decision may be a copy of the report or decision on the project permit application. The notice shall be provided to the applicant and to any person who, prior to the rendering of the decision, requested notice of the decision or submitted substantive comments on the application. The local government shall provide for notice of its decision as provided in RCW 36.70B.110(4), which shall also state that affected property owners may request a change in valuation for property tax purposes notwithstanding any program of revaluation. The local government shall provide notice of decision to the county assessor's office of the county or counties in which the property is situated.



Project permits that may be excluded from review.

(1) A local government by ordinance or resolution may exclude the following project permits from the provisions of RCW 36.70B.060 through * 36.70B.090 and 36.70B.110 through 36.70B.130: Landmark designations, street vacations, or other approvals relating to the use of public areas or facilities, or other project permits, whether administrative or quasi-judicial, that the local government by ordinance or resolution has determined present special circumstances that warrant a review process or time periods for approval which are different from that provided in RCW 36.70B.060 through * 36.70B.090 and 36.70B.110 through 36.70B.130.
(2) A local government by ordinance or resolution also may exclude the following project permits from the provisions of RCW 36.70B.060 and 36.70B.110 through 36.70B.130: Lot line or boundary adjustments and building and other construction permits, or similar administrative approvals, categorically exempt from environmental review under chapter 43.21C RCW, or for which environmental review has been completed in connection with other project permits.
(3) A local government must exclude project permits for interior alterations from site plan review, provided that the interior alterations do not result in the following:
(a) Additional sleeping quarters or bedrooms;
(b) Nonconformity with federal emergency management agency substantial improvement thresholds; or
(c) Increase the total square footage or valuation of the structure thereby requiring upgraded fire access or fire suppression systems.
(4) Nothing in this section exempts interior alterations from otherwise applicable building, plumbing, mechanical, or electrical codes.
(5) For purposes of this section, "interior alterations" include construction activities that do not modify the existing site layout or its current use and involve no exterior work adding to the building footprint.

NOTES:

*Reviser's note: RCW 36.70B.090 expired June 30, 2000, pursuant to 1998 c 286 s 8.



Local governments not planning under the growth management act may use provisions.

A local government not planning under RCW 36.70A.040 may incorporate some or all of the provisions of RCW 36.70B.060 through * 36.70B.090 and 36.70B.110 through 36.70B.130 into its procedures for review of project permits or other project actions.

NOTES:

*Reviser's note: RCW 36.70B.090 expired June 30, 2000, pursuant to 1998 c 286 s 8.



Additional project review encouragedConstruction (as amended by 2023 c 333).

(1) Each local government is encouraged to adopt further project review provisions to provide prompt, coordinated, and objective review and ensure accountability to applicants and the public, including expedited review for project permit applications for projects that are consistent with adopted development regulations or that include dwelling units that are affordable to low-income or moderate-income households and within the capacity of systemwide infrastructure improvements.
(2) Nothing in this chapter is intended or shall be construed to prevent a local government from requiring a preapplication conference or a public meeting by rule, ordinance, or resolution, where otherwise required by applicable state law.
(3) Each local government shall adopt procedures to monitor and enforce permit decisions and conditions.
(4) Nothing in this chapter modifies any independent statutory authority for a government agency to appeal a project permit issued by a local government.
(5) For the purposes of this section:
(a) A dwelling unit is affordable if it requires payment of monthly housing costs, including utilities other than telephone, of no more than 30 percent of the family's income.
(b) "Dwelling unit" means a residential living unit that provides complete independent living facilities for one or more persons and that includes permanent provisions for living, sleeping, eating, cooking, and sanitation, and that is sold or rented separately from other dwelling units.
(c) "Low-income household" means a single person, family, or unrelated persons living together whose adjusted income is less than 80 percent of the median family income, adjusted for household size, for the county where the household is located, as reported by the United States department of housing and urban development, or less than 80 percent of the city's median income if the project is located in the city, the city has median income of more than 20 percent above the county median income, and the city has adopted an alternative local median income.
(d) "Moderate-income household" means a single person, family, or unrelated persons living together whose adjusted income is at or below 120 percent of the median household income, adjusted for household size, for the county where the household is located, as reported by the United States department of housing and urban development, or less than 120 percent of the city's median income if the project is located in the city, the city has median income of more than 20 percent above the county median income, and the city has adopted an alternative local median income.

Additional project review encouragedAdditional measures for certain jurisdictionsConstruction (as amended by 2023 c 338).

(1) Each local government is encouraged to adopt further project review and code provisions to provide prompt, coordinated review and ensure accountability to applicants and the public((, including expedited review for project permit applications for projects that are consistent with adopted development regulations and within the capacity of systemwide infrastructure improvements))by:
(a) Expediting review for project permit applications for projects that are consistent with adopted development regulations;
(b) Imposing reasonable fees, consistent with RCW 82.02.020, on applicants for permits or other governmental approvals to cover the cost to the city, town, county, or other municipal corporation of processing applications, inspecting and reviewing plans, or preparing detailed statements required by chapter 43.21C RCW. The fees imposed may not include a fee for the cost of processing administrative appeals. Nothing in this subsection limits the ability of a county or city to impose a fee for the processing of administrative appeals as otherwise authorized by law;
(c) Entering into an interlocal agreement with another jurisdiction to share permitting staff and resources;
(d) Maintaining and budgeting for on-call permitting assistance for when permit volumes or staffing levels change rapidly;
(e) Having new positions budgeted that are contingent on increased permit revenue;
(f) Adopting development regulations which only require public hearings for permit applications that are required to have a public hearing by statute;
(g) Adopting development regulations which make preapplication meetings optional rather than a requirement of permit application submittal;
(h) Adopting development regulations which make housing types an outright permitted use in all zones where the housing type is permitted;
(i) Adopting a program to allow for outside professionals with appropriate professional licenses to certify components of applications consistent with their license; or
(j) Meeting with the applicant to attempt to resolve outstanding issues during the review process. The meeting must be scheduled within 14 days of a second request for corrections during permit review. If the meeting cannot resolve the issues and a local government proceeds with a third request for additional information or corrections, the local government must approve or deny the application upon receiving the additional information or corrections.
(2)(a) After January 1, 2026, a county or city must adopt additional measures under subsection (1) of this section at the time of its next comprehensive plan update under RCW 36.70A.130 if it meets the following conditions:
(i) The county or city has adopted at least three project review and code provisions under subsection (1) of this section more than five years prior; and
(ii) The county or city is not meeting the permitting deadlines established in RCW 36.70B.080 at least half of the time over the period since its most recent comprehensive plan update under RCW 36.70A.130.
(b) A city or county that is required to adopt new measures under (a) of this subsection but fails to do so becomes subject to the provisions of RCW 36.70B.080(1)(l), notwithstanding RCW 36.70B.080(1)(l)(ii).
(((2)))(3) Nothing in this chapter is intended or shall be construed to prevent a local government from requiring a preapplication conference or a public meeting by rule, ordinance, or resolution.
(((3)))(4) Each local government shall adopt procedures to monitor and enforce permit decisions and conditions.
(((4)))(5) Nothing in this chapter modifies any independent statutory authority for a government agency to appeal a project permit issued by a local government.

NOTES:

Reviser's note: RCW 36.70B.160 was amended twice during the 2023 legislative session, each without reference to the other. For rule of construction concerning sections amended more than once during the same legislative session, see RCW 1.12.025.



Development agreementsAuthorized.

(1) A local government may enter into a development agreement with a person having ownership or control of real property within its jurisdiction. A city may enter into a development agreement for real property outside its boundaries as part of a proposed annexation or a service agreement. A development agreement must set forth the development standards and other provisions that shall apply to and govern and vest the development, use, and mitigation of the development of the real property for the duration specified in the agreement. A development agreement shall be consistent with applicable development regulations adopted by a local government planning under chapter 36.70A RCW.
(2) RCW 36.70B.170 through 36.70B.190 and section 501, chapter 347, Laws of 1995 do not affect the validity of a contract rezone, concomitant agreement, annexation agreement, or other agreement in existence on July 23, 1995, or adopted under separate authority, that includes some or all of the development standards provided in subsection (3) of this section.
(3) For the purposes of this section, "development standards" includes, but is not limited to:
(a) Project elements such as permitted uses, residential densities, and nonresidential densities and intensities or building sizes;
(b) The amount and payment of impact fees imposed or agreed to in accordance with any applicable provisions of state law, any reimbursement provisions, other financial contributions by the property owner, inspection fees, or dedications;
(c) Mitigation measures, development conditions, and other requirements under chapter 43.21C RCW;
(d) Design standards such as maximum heights, setbacks, drainage and water quality requirements, landscaping, and other development features;
(e) Affordable housing;
(f) Parks and open space preservation;
(g) Phasing;
(h) Review procedures and standards for implementing decisions;
(i) A build-out or vesting period for applicable standards; and
(j) Any other appropriate development requirement or procedure.
(4) The execution of a development agreement is a proper exercise of county and city police power and contract authority. A development agreement may obligate a party to fund or provide services, infrastructure, or other facilities. A development agreement shall reserve authority to impose new or different regulations to the extent required by a serious threat to public health and safety.

NOTES:

FindingsIntent1995 c 347 ss 502-506: "The legislature finds that the lack of certainty in the approval of development projects can result in a waste of public and private resources, escalate housing costs for consumers and discourage the commitment to comprehensive planning which would make maximum efficient use of resources at the least economic cost to the public. Assurance to a development project applicant that upon government approval the project may proceed in accordance with existing policies and regulations, and subject to conditions of approval, all as set forth in a development agreement, will strengthen the public planning process, encourage private participation and comprehensive planning, and reduce the economic costs of development. Further, the lack of public facilities and services is a serious impediment to development of new housing and commercial uses. Project applicants and local governments may include provisions and agreements whereby applicants are reimbursed over time for financing public facilities. It is the intent of the legislature by RCW 36.70B.170 through 36.70B.210 to allow local governments and owners and developers of real property to enter into development agreements." [ 1995 c 347 s 501.]



Development agreementsEffect.

Unless amended or terminated, a development agreement is enforceable during its term by a party to the agreement. A development agreement and the development standards in the agreement govern during the term of the agreement, or for all or that part of the build-out period specified in the agreement, and may not be subject to an amendment to a zoning ordinance or development standard or regulation or a new zoning ordinance or development standard or regulation adopted after the effective date of the agreement. A permit or approval issued by the county or city after the execution of the development agreement must be consistent with the development agreement.

NOTES:

FindingsIntent1995 c 347 ss 502-506: See note following RCW 36.70B.170.



Development agreementsRecordingParties and successors bound.

A development agreement shall be recorded with the real property records of the county in which the property is located. During the term of the development agreement, the agreement is binding on the parties and their successors, including a city that assumes jurisdiction through incorporation or annexation of the area covering the property covered by the development agreement.

NOTES:

FindingsIntent1995 c 347 ss 502-506: See note following RCW 36.70B.170.



Development agreementsPublic hearing.

A county or city shall only approve a development agreement by ordinance or resolution after a public hearing. The county or city legislative body or a planning commission, hearing examiner, or other body designated by the legislative body to conduct the public hearing may conduct the hearing. If the development agreement relates to a project permit application, the provisions of chapter 36.70C RCW shall apply to the appeal of the decision on the development agreement.

NOTES:

FindingsIntent1995 c 347 ss 502-506: See note following RCW 36.70B.170.



Development agreementsAuthority to impose fees not extended.

Nothing in RCW 36.70B.170 through 36.70B.200 and section 501, chapter 347, Laws of 1995 is intended to authorize local governments to impose impact fees, inspection fees, or dedications or to require any other financial contributions or mitigation measures except as expressly authorized by other applicable provisions of state law.

NOTES:

FindingsIntent1995 c 347 ss 502-506: See note following RCW 36.70B.170.



Permit assistance staff.

(1) Each county and city having populations of ten thousand or more that plan under RCW 36.70A.040 shall designate permit assistance staff whose function it is to assist permit applicants. An existing employee may be designated as the permit assistance staff.
(2) Permit assistance staff designated under this section shall:
(a) Make available to permit applicants all current local government regulations and adopted policies that apply to the subject application. The local government shall provide counter copies thereof and, upon request, provide copies according to chapter 42.56 RCW. The staff shall also publish and keep current one or more handouts containing lists and explanations of all local government regulations and adopted policies;
(b) Establish and make known to the public the means of obtaining the handouts and related information; and
(c) Provide assistance regarding the application of the local government's regulations in particular cases.
(3) Permit assistance staff designated under this section may obtain technical assistance and support in the compilation and production of the handouts under subsection (2) of this section from the department of commerce.

NOTES:

PurposeEffective date2010 c 271: See notes following RCW 43.330.005.
Findings1996 c 206: See note following RCW 43.05.030.



Planning regulationsCopies provided to county assessor.

By July 31, 1997, a local government planning under RCW 36.70A.040 shall provide to the county assessor a copy of the local government's comprehensive plan and development regulations in effect on July 1st of that year and shall thereafter provide any amendments to the plan and regulations that were adopted before July 31st of each following year.



Consolidated permit review grant program.

(1) Subject to the availability of funds appropriated for this specific purpose, the department of commerce must establish a consolidated permit review grant program. The department may award grants to any local government that provides, by ordinance, resolution, or other action, a commitment to the following building permit review consolidation requirements:
(a) Issuing final decisions on residential permit applications within 45 business days or 90 calendar days.
(i) To achieve permit review within the stated time periods, a local government must provide consolidated review for building permit applications. This may include an initial technical peer review of the application for conformity with the requirements of RCW 36.70B.070 by all departments, divisions, and sections of the local government with jurisdiction over the project.
(ii) A local government may contract with a third-party business to conduct the consolidated permit review or as additional inspection staff. Any funds expended for such a contract may be eligible for reimbursement under chapter 338, Laws of 2023.
(iii) Local governments are authorized to use grant funds to contract outside assistance to audit their development regulations to identify and correct barriers to housing development.
(b) Establishing an application fee structure that would allow the jurisdiction to continue providing consolidated permit review within 45 business days or 90 calendar days.
(i) A local government may consult with local building associations to develop a reasonable fee system.
(ii) A local government must determine, no later than July 1, 2024, the specific fee structure needed to provide permit review within the time periods specified in this subsection (1)(b).
(2) A jurisdiction that is awarded a grant under this section must provide a quarterly report to the department of commerce. The report must include the average and maximum time for permit review during the jurisdiction's participation in the grant program.
(3) If a jurisdiction is unable to successfully meet the terms and conditions of the grant, the jurisdiction must enter a 90-day probationary period. If the jurisdiction is not able to meet the requirements of this section by the end of the probationary period, the jurisdiction is no longer eligible to receive grants under this section.
(4) For the purposes of this section, "residential permit" means a permit issued by a city or county that satisfies the conditions of *RCW 19.27.015(5) and is within the scope of the international residential code, as adopted in accordance with chapter 19.27 RCW.

NOTES:

*Reviser's note: RCW 19.27.015 was amended by 2024 c 170 s 9, changing subsection (5) to subsection (10).



Permit review process update grant program.

(1) Subject to the availability of funds appropriated for this specific purpose, the department of commerce must establish a grant program for local governments to update their permit review process from paper filing systems to software systems capable of processing digital permit applications, virtual inspections, electronic review, and with capacity for video storage.
(2) The department of commerce may only provide a grant under this section to a city if the city allows for the development of at least two units per lot on all lots zoned predominantly for residential use within its jurisdiction.



Technical assistance to local governments.

(1) The department of commerce shall develop and provide technical assistance and guidance to counties and cities in setting fee structures under RCW 36.70B.160(1) to ensure that the fees are reasonable and sufficient to recover true costs. The guidance must include information on how to utilize growth factors or other measures to reflect cost increases over time.
(2) When providing technical assistance under subsection (1) of this section, the department of commerce must prioritize local governments that have implemented at least three of the options in RCW 36.70B.160(1).



Data reporting template.

The department of commerce shall develop a template for counties and cities subject to the requirements in RCW 36.70B.080, which will be utilized for reporting data.



Electricity projectsProhibition on demonstration of need.

During project review of a project to construct or improve facilities for the generation, transmission, or distribution of electricity, a local government may not require a project applicant to demonstrate the necessity or utility of the project other than to require, as part of a completed application under RCW 36.70B.070(2), submission of any publicly available documentation required by the federal energy regulatory commission or its delegees or the utilities and transportation commission or its delegees, or from any other federal agency with regulatory authority over the assessment of electric power transmission and distribution needs as applicable.

NOTES:

FindingsIntent2023 c 230: See note following RCW 43.394.010.



Construction crane safetyLocal government permitting. (Effective January 1, 2025.)

(1) When a worksite contains a tower crane, the local government in which the tower crane is located must, at a minimum, do the following before any assembly, disassembly, or reconfiguration of the tower crane:
(a) Align permit issuance for street closures with the definition of assembly/disassembly work zone when a tower crane is being assembled, disassembled, reconfigured, or otherwise not fully stabilized and secure;
(b) Issue street closure permits with consideration for sufficient time, as defined by the permit applicant, to safely conduct assembly, disassembly, or reconfiguration; and
(c) Develop permitting procedures that provide notice to residents and occupants in buildings within the assembly/disassembly work zone in advance of any assembly, disassembly, or reconfiguration.
(2) For purposes of this section, "assembly, disassembly, or reconfiguration" and "assembly/disassembly work zone" have the same meanings as those terms are defined in RCW 49.17.400.

NOTES:

ApplicationEffective date2024 c 311: See notes following RCW 49.17.400.
FindingApplication2024 c 311: See notes following RCW 49.17.435.



FindingSeverabilityPart headings and table of contents not law1995 c 347.

See notes following RCW 36.70A.470.