Foreign or alien carriers—Required RBC report—Commissioner may require RBC plan—Mandatory control level event.
(1) Any foreign or alien carrier shall, upon the written request of the commissioner, submit to the commissioner an RBC report as of the end of the calendar year just ended by the later of:
(a) The date an RBC report would be required to be filed by a domestic carrier under RCW
48.43.300 through
48.43.370; or
(b) Fifteen days after the request is received by the foreign or alien carrier. Any foreign or alien carrier shall, at the written request of the commissioner, promptly submit to the commissioner a copy of any RBC plan that is filed with the insurance commissioner of any other state.
(2) In the event of a company action level event, regulatory action level event, or authorized control level event with respect to any foreign or alien carrier as determined under the RBC statute applicable in the state of domicile of the carrier or, if no RBC statute is in force in that state, under the provisions of RCW
48.43.300 through
48.43.370, if the insurance commissioner of the state of domicile of the foreign or alien carrier fails to require the foreign or alien carrier to file an RBC plan in the manner specified under that state's RBC statute or, if no RBC statute is in force in that state, under RCW
48.43.310, the commissioner may require the foreign or alien carrier to file an RBC plan with the commissioner. In this event, the failure of the foreign or alien carrier to file an RBC plan with the commissioner is grounds to order the carrier to cease and desist from writing new insurance business in this state.
(3) In the event of a mandatory control level event with respect to any foreign or alien carrier, if no domiciliary receiver has been appointed with respect to the foreign or alien carrier under the rehabilitation and liquidation statute applicable in the state of domicile of the foreign or alien carrier, the commissioner may apply for an order under RCW
48.31.080 or
48.31.090 to conserve the assets within this state of foreign or alien carriers, and the occurrence of the mandatory control level event is considered adequate grounds for the application.